PROJECT OVERVIEW

In Elsthorpe, Hawke’s Bay, Rycroft Construction was engaged to strengthen an existing bridge to meet updated engineering and load requirements. The project involved installing a new steel pile bent system beneath the bridge to provide additional support and stability to the existing structure.

PROJECT DETAILS

KEY CAPABILITIES DEMONSTRATED

  • Design and installation of a custom steel pile bent system.

  • Precision steelwork using UC piles, UB cross beams, and PFC bracing.

  • Integration of new structural support into an existing bridge framework.

  • Application of protective Goldseal coating for enhanced durability.

  • Delivery of a compliant, high-capacity bridge structure rated to 55 tonnes.

    • 18 m long × 4 m wide bridge deck.

    • Four 250 UC piles driven to 9 m depth with a 610 UB cross beam supporting the deck.

    • 250 PFC bracing members installed for lateral stability.

    • New 180 mm-thick concrete deck slabs, rated for 55 tonnes.

    • All steel components coated in Goldseal for long-term corrosion protection.

  • To reinforce and extend the life of an existing bridge by adding structural support to the abutments, ensuring compliance with engineering requirements and improved load performance.

  • Private agricultural client, Elsthorpe, Hawke’s Bay.

TAKE A LOOK AT MORE PROJECTS

From bridge renewals to full rebuilds — see more of our work across the Wairarapa and beyond. Each project tells the story of a challenge overcome and a lasting structure delivered. Explore how Rycroft Construction designs, repairs, and builds bridges that stand the test of time

VIEW PROJECTS

Delivering reliable bridge construction and repair projects across Masterton, Carterton, Greytown, and Martinborough — and further afield throughout the lower North Island.

MEMBERS OF AND ACCREDITED WITH: